Residential
Page 1
of 21
1 2 3 4 5 6 7 8 9 10-19 20-21 Next
Steep Pitched SIPs House, Fallowfield
Started: 20.10.09
Completed: 12.11.09
The roof pitch is very steep at 62 degrees which did cause a few problems when fixing the breather paper. The roof design has enabled Isobel to fully utilise the limited plot size and she has managed to achive a spacious three bedroomed house with a footprint of 9m X 10m.…
More details
Raising the Roof using SIPs
Started: 11.9.09
Completed: 19.9.09
The client had purchased a bungalow on a fantastic plot, the architects brief was to add an additional floor to achieve a low energy four bedroomed family home. The lightweight nature of SIPs and the speed of erection has allowed the architect to achieve his goal.
More details
Large SIPs Extension, Sheffield
Started: 2.9.09
Completed: 14.9.09
This was an extremely complex extension which Will decided to tackle as his first SIPs job - made more complicated by the fact that the house was being lived in at the same time!
More details
Page 1
of 21
1 2 3 4 5 6 7 8 9 10-19 20-21 Next